{"id":435,"date":"2026-07-22T16:26:47","date_gmt":"2026-07-22T16:26:47","guid":{"rendered":"https:\/\/qualityelectriccontracting.ca\/?page_id=435"},"modified":"2026-07-22T16:26:50","modified_gmt":"2026-07-22T16:26:50","slug":"storage-systems","status":"publish","type":"page","link":"https:\/\/qualityelectriccontracting.ca\/?page_id=435","title":{"rendered":"Storage Systems"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We have all heard of Tesla\u2019s Power Wall and I realize that in today\u2019s political landscape you may want to choose another option. We are searching thru the companies out there to find quality products that will meet your needs at an affordable price. You may ask why choose to install a storage system;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Reduce Energy Costs<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Energy storage allows you to store excess solar power, reducing reliance on the grid and lowering electricity bills.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Reduce Carbon Footprint<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">By using stored solar energy, you minimize dependence on fossil fuels, contributing to a cleaner environment.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Power outage protection<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Solar batteries provide backup power during outages, ensuring uninterrupted energy supply for your home or business.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Off-grid independence&nbsp;&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Energy storage gives you the flexibility to live or operate in remote areas without access to the traditional power grid.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"480\" height=\"6\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/06\/redline.gif\" alt=\"\" class=\"wp-image-33\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">We have a couple of Storage solutions available through our Suppliers,&nbsp;<strong>Fortress<\/strong>&nbsp;and&nbsp;<strong>Generac<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><br><a href=\"https:\/\/www.fortresspower.com\/products\/durarack-indoor-outdoor-enclosure\/\">FEATURES of Fortress Power DuraRack<\/a><\/h3>\n\n\n\n<h3 class=\"wp-block-heading\"><br>Indoor\/Outdoor Rated Protection<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Built to handle the elements, the DuraRack enclosure is IP65-rated for water and dust resistance \u2014 so this makes DuraRack perfect for both indoor utility rooms and exposed outdoor environments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Integrated Busbars &amp; Cables<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pre-wired with built-in busbars and battery cables, the DuraRack simplifies installation and makes stacking multiple batteries faster and more organized.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Thermostat-Ready for Cold Climates Easily add a DIN rail-mounted thermostat to activate heating in low temperatures \u2014 ideal for cold-weather installations that demand year-round reliability.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.fortresspower.com\/wp-content\/uploads\/2025\/05\/600x900_durarack_feature.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Passive Cooling for Hot Climates<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Designed with vented airflow to promote natural passive cooling, helping maintain optimal battery performance in warm environments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Scalable Storage Capacity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Each DuraRack stores up to 4 eFlex 5.4kWh batteries, and is expandable up to 4 units (15 eFlex batteries, 81KWh)<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Secure, Professional Appearance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The DuraRack combines durability with a clean, tamper-resistant design \u2014 providing a secure, polished solution for residential and commercial projects alike.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Generac:<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"711\" height=\"921\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page1.png\" alt=\"\" class=\"wp-image-234\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page1.png 711w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page1-232x300.png 232w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page1-90x116.png 90w\" sizes=\"auto, (max-width: 711px) 100vw, 711px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"711\" height=\"921\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page2.png\" alt=\"\" class=\"wp-image-235\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page2.png 711w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page2-232x300.png 232w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page2-90x116.png 90w\" sizes=\"auto, (max-width: 711px) 100vw, 711px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"708\" height=\"918\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page3.png\" alt=\"\" class=\"wp-image-236\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page3.png 708w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page3-231x300.png 231w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page3-89x116.png 89w\" sizes=\"auto, (max-width: 708px) 100vw, 708px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"713\" height=\"921\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page4.png\" alt=\"\" class=\"wp-image-237\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page4.png 713w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page4-232x300.png 232w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page4-90x116.png 90w\" sizes=\"auto, (max-width: 713px) 100vw, 713px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"706\" height=\"918\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page5.png\" alt=\"\" class=\"wp-image-238\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page5.png 706w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page5-231x300.png 231w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page5-89x116.png 89w\" sizes=\"auto, (max-width: 706px) 100vw, 706px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"712\" height=\"922\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page6.png\" alt=\"\" class=\"wp-image-239\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page6.png 712w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page6-232x300.png 232w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page6-90x116.png 90w\" sizes=\"auto, (max-width: 712px) 100vw, 712px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"709\" height=\"920\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page7.png\" alt=\"\" class=\"wp-image-240\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page7.png 709w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page7-231x300.png 231w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page7-89x116.png 89w\" sizes=\"auto, (max-width: 709px) 100vw, 709px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"708\" height=\"919\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page8.png\" alt=\"\" class=\"wp-image-241\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page8.png 708w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page8-231x300.png 231w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page8-89x116.png 89w\" sizes=\"auto, (max-width: 708px) 100vw, 708px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"708\" height=\"923\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page9.png\" alt=\"\" class=\"wp-image-242\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page9.png 708w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page9-230x300.png 230w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page9-89x116.png 89w\" sizes=\"auto, (max-width: 708px) 100vw, 708px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"712\" height=\"920\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page10.png\" alt=\"\" class=\"wp-image-243\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page10.png 712w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page10-232x300.png 232w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page10-90x116.png 90w\" sizes=\"auto, (max-width: 712px) 100vw, 712px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"706\" height=\"921\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page11.png\" alt=\"\" class=\"wp-image-244\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page11.png 706w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page11-230x300.png 230w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page11-89x116.png 89w\" sizes=\"auto, (max-width: 706px) 100vw, 706px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"710\" height=\"921\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page12.png\" alt=\"\" class=\"wp-image-245\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page12.png 710w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page12-231x300.png 231w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page12-89x116.png 89w\" sizes=\"auto, (max-width: 710px) 100vw, 710px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"708\" height=\"924\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page13.png\" alt=\"\" class=\"wp-image-246\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page13.png 708w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page13-230x300.png 230w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page13-89x116.png 89w\" sizes=\"auto, (max-width: 708px) 100vw, 708px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"708\" height=\"926\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page14.png\" alt=\"\" class=\"wp-image-247\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page14.png 708w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page14-229x300.png 229w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page14-89x116.png 89w\" sizes=\"auto, (max-width: 708px) 100vw, 708px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"711\" height=\"919\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page15.png\" alt=\"\" class=\"wp-image-248\" srcset=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page15.png 711w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page15-232x300.png 232w, https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/07\/page15-90x116.png 90w\" sizes=\"auto, (max-width: 711px) 100vw, 711px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"480\" height=\"6\" src=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/06\/redline.gif\" alt=\"\" class=\"wp-image-33\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>We have all heard of Tesla\u2019s Power Wall and I realize that in today\u2019s political landscape you may want to &hellip; <a href=\"https:\/\/qualityelectriccontracting.ca\/?page_id=435\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Storage Systems<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":86,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-435","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Storage Systems - VI Quality Electric Contracting Ltd.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/qualityelectriccontracting.ca\/?page_id=435\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Storage Systems - VI Quality Electric Contracting Ltd.\" \/>\n<meta property=\"og:description\" content=\"We have all heard of Tesla\u2019s Power Wall and I realize that in today\u2019s political landscape you may want to &hellip; Continue reading Storage Systems\" \/>\n<meta property=\"og:url\" content=\"https:\/\/qualityelectriccontracting.ca\/?page_id=435\" \/>\n<meta property=\"og:site_name\" content=\"VI Quality Electric Contracting Ltd.\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-22T16:26:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/06\/redline.gif\" \/>\n\t<meta property=\"og:image:width\" content=\"480\" \/>\n\t<meta property=\"og:image:height\" content=\"6\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/gif\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435\",\"url\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435\",\"name\":\"Storage Systems - VI Quality Electric Contracting Ltd.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/redline.gif\",\"datePublished\":\"2026-07-22T16:26:47+00:00\",\"dateModified\":\"2026-07-22T16:26:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435#primaryimage\",\"url\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/redline.gif\",\"contentUrl\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/redline.gif\",\"width\":480,\"height\":6},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=435#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Alternative Energy\",\"item\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?page_id=86\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Storage Systems\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/#website\",\"url\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/\",\"name\":\"VI Quality Electric Contracting Ltd.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/#organization\",\"name\":\"VI Quality Electric Contracting Ltd.\",\"url\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/cropped-Matthew-2025v1-2.png\",\"contentUrl\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/cropped-Matthew-2025v1-2.png\",\"width\":400,\"height\":124,\"caption\":\"VI Quality Electric Contracting Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/qualityelectriccontracting.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Storage Systems - VI Quality Electric Contracting Ltd.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/qualityelectriccontracting.ca\/?page_id=435","og_locale":"en_US","og_type":"article","og_title":"Storage Systems - VI Quality Electric Contracting Ltd.","og_description":"We have all heard of Tesla\u2019s Power Wall and I realize that in today\u2019s political landscape you may want to &hellip; Continue reading Storage Systems","og_url":"https:\/\/qualityelectriccontracting.ca\/?page_id=435","og_site_name":"VI Quality Electric Contracting Ltd.","article_modified_time":"2026-07-22T16:26:50+00:00","og_image":[{"width":480,"height":6,"url":"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/06\/redline.gif","type":"image\/gif"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/qualityelectriccontracting.ca\/?page_id=435","url":"https:\/\/qualityelectriccontracting.ca\/?page_id=435","name":"Storage Systems - VI Quality Electric Contracting Ltd.","isPartOf":{"@id":"https:\/\/qualityelectriccontracting.ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/qualityelectriccontracting.ca\/?page_id=435#primaryimage"},"image":{"@id":"https:\/\/qualityelectriccontracting.ca\/?page_id=435#primaryimage"},"thumbnailUrl":"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/06\/redline.gif","datePublished":"2026-07-22T16:26:47+00:00","dateModified":"2026-07-22T16:26:50+00:00","breadcrumb":{"@id":"https:\/\/qualityelectriccontracting.ca\/?page_id=435#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/qualityelectriccontracting.ca\/?page_id=435"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/qualityelectriccontracting.ca\/?page_id=435#primaryimage","url":"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/06\/redline.gif","contentUrl":"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/06\/redline.gif","width":480,"height":6},{"@type":"BreadcrumbList","@id":"https:\/\/qualityelectriccontracting.ca\/?page_id=435#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/qualityelectriccontracting.ca\/"},{"@type":"ListItem","position":2,"name":"Alternative Energy","item":"https:\/\/qualityelectriccontracting.ca\/?page_id=86"},{"@type":"ListItem","position":3,"name":"Storage Systems"}]},{"@type":"WebSite","@id":"https:\/\/qualityelectriccontracting.ca\/#website","url":"https:\/\/qualityelectriccontracting.ca\/","name":"VI Quality Electric Contracting Ltd.","description":"","publisher":{"@id":"https:\/\/qualityelectriccontracting.ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/qualityelectriccontracting.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/qualityelectriccontracting.ca\/#organization","name":"VI Quality Electric Contracting Ltd.","url":"https:\/\/qualityelectriccontracting.ca\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/qualityelectriccontracting.ca\/#\/schema\/logo\/image\/","url":"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/08\/cropped-Matthew-2025v1-2.png","contentUrl":"https:\/\/qualityelectriccontracting.ca\/wp-content\/uploads\/2025\/08\/cropped-Matthew-2025v1-2.png","width":400,"height":124,"caption":"VI Quality Electric Contracting Ltd."},"image":{"@id":"https:\/\/qualityelectriccontracting.ca\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=\/wp\/v2\/pages\/435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=435"}],"version-history":[{"count":1,"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=\/wp\/v2\/pages\/435\/revisions"}],"predecessor-version":[{"id":436,"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=\/wp\/v2\/pages\/435\/revisions\/436"}],"up":[{"embeddable":true,"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=\/wp\/v2\/pages\/86"}],"wp:attachment":[{"href":"https:\/\/qualityelectriccontracting.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}